Dubai

Dubai Water Canal

0
(0)
Opening Time: 24hrs

Dubai Water Canal

Dubai Canal is an artificial water canal unveiled on 2 October 2013 and inaugurated on 9 November 2016. The canal sidewalk comprises one shopping center, four hotels, 450 restaurants, luxury housing, walkways, and cycle paths. It is a 3.2 km (2.0 mi) long project starting from Business Bay into the Persian Gulf through Safa Park and Jumeirah.

The width ranges from 80 m (260 ft) to 120 m (390 ft). It is 6 m (20 ft) feet deep and be crossed by 8 m (26 ft) high bridges. It creates new public places and facilities with a total area of 80,000 m2 (860,000 sq ft) with private marinas for boats and a trade center at the entrance of the canal. The development was designed by AE7 Architects and Planners. Roads and Transport Authority (RTA) built bridges over the canal for Sheikh Zayed Road, Al Wasl Road, and Jumeirah Road. The Sheikh Zayed road bridge has eight lanes in each direction and three lanes in each direction on Al Wasl Road and Jumeirah Road. The crossings are 8.5 meters above the water to allow boats to pass underneath.


Reference

How useful was this post?

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.

Leave a Reply

Your email address will not be published. Required fields are marked *

Arabic Arabic English English